Jie Tai Super Charging Station

Jie Tai Super Charging Station

Sep 22, 2023

Goldgun participated in and led the construction and operation of Super Charging Station. There are a total of 72 DC charging spaces in the charging station, all of which are flexible power distribution charging spaces. 240KW outdoor one-to-eight charging stacks are used to provide 24-hour uninterrupted charging services for logistics vehicles in the station. The operation of the station has received good response so far.

The station integrates the new green concept of photovoltaic and energy storage, combined with energy storage batteries, effectively guarantees the power supply capacity of the station, and makes full use of peak and valley electricity prices, greatly saving the operating cost of the station."

Jiashan High Speed ​​Rail Station, Zhejiang
How to charge new energy vehicles without damaging the battery?